Provision of IoT and Telemetry Infrastructure for Tunnel and Station Smart Maintenance (Contract No.: C3187-20E)

Prequalification Invitation

 

Provision of IoT and Telemetry Infrastructure for

Tunnel and Station Smart Maintenance

Contract No.: C3187-20E

 

 

MTR Corporation Limited invites qualified companies to express their interest in tendering for the provision of Internet of Things (IoT) and telemetry infrastructure for stations and track areas in Airport Express Line, Disney Resort Line, Island Line, Kwun Tong Line, South Island Line, Tung Chung Line, Tseung Kwan O Line, Tsuen Wan Line, East Rail Line, West Rail Line and Tuen Ma Line Phase 1. 

 

The infrastructure is to provide IoT coverage using Long Range (LoRa) technology to stations and track areas in the above 11 railway lines. The infrastructure will be ready for receiving signals from external LoRa sensors from interfacing parties to be installed in the future. The infrastructure shall include functions of data collection from sensors, data processing of sensor data received and data storage. As an output of the infrastructure, an interface protocol shall be available for the data exchange to interfacing parties.

 

The infrastructure shall support future IoT sensing devices to be installed in stations and track areas with defined standard and protocol. Data shall be transmitted via existing leaky cables or antennas. Existing 900-MHz band blocking radio equipment shall be replaced. Additional Point of Interface shall be installed. IoT gateway shall be installed for the insertion of the frequency band of LoRa. Servers and workstations shall be installed in Operations Control Centre for data processing, data storage and system health monitoring. Data between IoT gateway and servers shall be transmitted through Corporate Data Network. 

 

The scope of the Works including the design, manufacture, supply, delivery, installation, decommissioning of existing equipment, testing and commissioning, documentation, training, maintenance services, and rectification of defects and product support during the Defects Liability Period of the IoT and telemetry infrastructure.   

 

The prequalification process for the tender will take place in July and August 2020 and tenders will be invited in September 2020.

 

In order to be considered for prequalification, interested parties having relevant resources, qualifications and experience are requested to express their interest on or before 30 June 2020 via the MTR Corporation Limited’s E-Tendering System.  

 

For applicants registered under the E-Tendering System, please click the following link and log into the System for expression of interest:

http://www.hkextender.com

 

For applicants not registered under the E-Tendering System, please click the following link and search for the advertisement notice of this Contract for expression of interest:

http://www.hkextender.com/process/GuestLogon.asp

 

All invitations and submissions for prequalification and tender will be carried out through the E-Tendering System at http://www.hkextender.com.

 

Applicants responding to this advertisement are deemed to have complied with the Personal Data (Privacy) Ordinance in the collection and transfer of personal data to MTR Corporation Limited. All information submitted including personal data, will be used by MTR Corporation Limited for the prequalification of tenderers for this Contract.

 

For enquiries, please contact Mr. David Wong, Senior Contracts Engineer on (852) 2993 2641 or by fax (852) 2993 7773.